ADU Site Inspections and Quality Control Services in Pasadena, CA
Building an accessory dwelling unit in Pasadena that passes every building department inspection and meets long-term durability standards requires systematic oversight at every construction phase. Pasadena Master ADU Builder delivers comprehensive ADU site inspections and quality control using punch list documentation, photo verification, code compliance checklists, and third-party testing so issues get identified and corrected before they become costly problems. We conduct foundation inspections checking rebar placement and concrete strength, framing inspections verifying shear wall installation and structural connections, rough-in inspections ensuring proper electrical conduit routing and plumbing venting, and final walkthrough inspections confirming finish quality and fixture operation while coordinating required Title 24 energy testing, fire safety verification, and ADA compliance reviews.
We walk you through what our comprehensive inspections cover including moisture barrier installation, insulation R-value verification, HVAC ductwork testing, and waterproofing membrane application alongside documented quality control procedures using deficiency reports, corrective action plans, and progress photography. Our Pasadena base and local experience mean we know city building codes, common soil settlement issues, setback enforcement practices, and design review board expectations so we handle permits, challenging site conditions, and subcontractor coordination with confidence. Expect systematic oversight that prevents framing errors, plumbing leaks, electrical hazards, and finish defects.
ADU Quality Control Standards and Procedures
We set measurable benchmarks, follow Pasadena code, and document every inspection step. Our process emphasizes code compliance, material verification, and clear final reports for homeowners and permitting officials.
Adherence to Pasadena Building Codes
We verify compliance with Pasadena Municipal Code and California Building Code chapter references relevant to ADUs. This includes minimum ceiling heights, egress window sizes, fire separation distances, and permitted plumbing fixture counts. We check site-specific requirements such as local zoning setbacks, maximum lot coverage, and parking exceptions that affect ADU placement. We confirm that foundations, framing, and roof assemblies meet required loads and exposure standards referenced in structural plans.
We conduct plan review cross-checks against approved permit drawings before construction begins. We log any deviations, submit correction requests to the plans examiner when needed, and coordinate permit re-submittals. We document code citations and inspector approvals with dated photos and annotated notes for permit records and homeowner transparency.
Quality Assurance Techniques
We use a standardized inspection checklist tailored to ADUs in Pasadena. The checklist covers site prep, utilities, framing, insulation, HVAC, electrical, plumbing, and finishes. We perform staged inspections at foundation, pre-drywall, mechanical rough-in, and final stages to catch defects early and reduce rework. Each stage requires digital photo evidence, inspector initials, and a resolution timeline for deficiencies.
We employ calibrated tools including laser levels, moisture meters, and thermal imagers to verify flatness, dryness, and insulation continuity. We test electrical circuits and plumbing fixtures under load to ensure performance. We track nonconformances in a shared project log and assign corrective actions with deadlines. Our subcontractor performance metrics include defect rates and on-time corrective completion.
Final Walkthrough and Documentation
We conduct a formal final walkthrough with the homeowner and the city inspector when required. During the walkthrough, we demonstrate operation of systems such as HVAC, water heaters, and GFCI/AFCI protections. We review warranty information, maintenance recommendations, and manufacturer instructions for installed equipment. We ensure the homeowner receives all necessary as-built drawings and appliance manuals.
We compile a final report that includes pass/fail checklists, annotated photos, permit sign-offs, and a punch list of any remaining items. The report is delivered digitally and stored in our project archive for future reference. We obtain final occupancy approval when applicable and provide contact points for warranty support and future inspections.
Comprehensive ADU Site Inspections
We document conditions that affect feasibility, cost, and schedule. Our inspections identify grading, access, utilities, and code constraints so clients know exactly what to expect.
Initial Site Assessment Process
We begin with a site visit and records review to confirm property lines, easements, and existing structures. We photograph and measure setbacks, slopes, driveway widths, and usable yard area to determine buildable footprint. We pull parcel maps, previous surveys, and zoning information from city records for Pasadena and Los Angeles County. We verify zoning classification, ADU allowances, maximum square footage, and parking requirements that apply to the property.
We scan for utilities at the curb and on the lot. We note water, sewer, gas, electric, and communications locations and determine whether relocations, trenching, or upgraded services will be required. We prepare a written feasibility summary with cost drivers and permitting risks. That document lists clear next steps, estimated timeline ranges, and recommendations for survey, geotechnical, or utility design if needed.
On-Site Evaluation Criteria
We evaluate topography first, marking grades and existing drainage paths. Steep slopes and concentrated runoff can require retaining walls or engineered drainage, which affect foundation type and cost. We inspect existing structures and foundations for settlement, damage, or code nonconformance. Proximity of trees, root systems, and overhanging branches informs setback clearance and potential root mitigation measures.
We confirm access for construction equipment and material staging. We measure gate widths, driveway turning radii, and street parking restrictions to plan deliveries and crane operations if necessary. We document soil conditions visually and collect samples when indicated. Combined with geotechnical reporting, this determines foundation design, expected excavation depth, and whether shoring or pier foundations are necessary.
Common Inspection Challenges
Encroachments and unclear property lines create delay and often require a boundary survey. We flag neighboring retaining walls and fences that may be on or near the parcel to prevent disputes during construction. Undocumented utilities or mismarked lines increase cost and risk. We recommend pot holing and utility locating before demolition to avoid service interruptions and unexpected relocations.
Historic or protected trees and steep site constraints can limit ADU placement. When trees require preservation, we coordinate with arborists and propose alternate layouts to meet both protection and build objectives. Nonconforming setbacks, restrictive CC&Rs, and limited street access are recurring hurdles. We outline mitigation options such as reduced footprints, variance applications, or engineering solutions and estimate their typical schedule impacts.
Why Choose Us for ADU Site Inspections and Quality Control Services
We bring 20 years of ADU site inspection and quality control experience in Pasadena and surrounding communities. Our long track record means we understand local code nuances, common site challenges, and realistic timelines.
We operate with certified inspectors and licensed contractors on every project. That combination helps us catch issues early and keep construction aligned with plans and permits.
We maintain clear documentation for each inspection. Photos, annotated reports, and checklists make project decisions faster for homeowners and permit holders.
We focus on measurable quality controls. Our process includes pre-construction site evaluation, stage inspections, and final verification to ensure compliance and build durability.
We communicate promptly and directly with owners, architects, and city inspectors. Regular updates and accessible records reduce surprises and help projects move forward.
We offer transparent pricing and scope statements. Clients receive itemized inspection fees and a defined list of deliverables before work begins.
We prioritize safety and code compliance. Our teams follow current California codes and local Pasadena amendments to minimize rework and approval delays.
Key advantages:
- 20 years of specialized ADU inspection experience
- Licensed inspectors and contractors on staff
- Detailed, photo-backed reports for each inspection
- Stage-based quality control process
- Transparent pricing and clear deliverables
We align our inspections with your project schedule and quality expectations. Our goal is to provide reliable, verifiable inspection services that protect your investment.

Frequently Asked Questions About ADU Site Inspections and Quality Control
What inspections are required for ADU construction?
ADU construction requires foundation inspection before concrete pour, framing inspection verifying structural lumber and connections, rough plumbing inspection checking drain, waste, and vent lines, rough electrical inspection examining wiring and panel installation, rough mechanical inspection for HVAC ducting and equipment, fire sprinkler system inspection, insulation inspection before drywall, Title 24 energy compliance inspection, and final inspection covering all completed work before certificate of occupancy issuance through Pasadena Building & Safety Department.
How many inspections does an ADU need before occupancy?
ADUs typically need 8 to 12 inspections before occupancy depending on project complexity and construction type. Standard inspections include foundation, framing, rough plumbing, rough electrical, rough mechanical, fire sprinkler, insulation, and final inspection. Additional inspections may be required for gas lines, sewer lateral connections, waterproofing, special foundation conditions, solar installations, and utility meter installations coordinated through Pasadena Water and Power and Southern California Gas Company.
What is quality control in ADU construction?
Quality control in ADU construction involves systematic verification that work meets building codes, architectural plans, and construction standards through regular site inspections by project managers, third-party quality inspectors, and building officials. Pasadena Master ADU Builder conducts daily progress reviews, pre-inspection walkthroughs, material verification, workmanship assessments, and punch list development to identify deficiencies before city inspections, ensuring compliance with California Building Code, manufacturer specifications, and contract requirements.
What happens if my ADU fails an inspection?
If an ADU fails inspection, the building inspector issues a correction notice detailing deficiencies that must be addressed before re-inspection. Work cannot proceed in affected areas until corrections are completed and approved. The contractor schedules repairs, notifies the building department when ready, and requests re-inspection which typically occurs within 2-5 business days. Multiple failures may trigger additional plan review, increase project costs, and delay timeline by 1-3 weeks per failed inspection.
How long do ADU inspections take?
ADU inspections typically take 30 minutes to 2 hours depending on inspection type and project size. Foundation and rough inspections usually complete in 45-60 minutes, while comprehensive final inspections examining all systems, finishes, appliances, fire safety equipment, and Title 24 compliance documentation may take 90-120 minutes. Inspectors provide verbal feedback onsite and post written results to permit portals within 24-48 hours through Pasadena Building & Safety Department systems.